GLE has provided various environmental services for the Florida Hospital in Orlando. Services include asbestos consulting, indoor air quality.
GLE has provided hazardous materials consulting services on over 60 renovation projects at the VA Medical Center.
GLE has served as an environmental engineering services consultant for UF Health Jacksonville since 2004, successfully completing over 850 projects.
GLE served as the design and construction manager for the environmental remediation and demolition of Building 747 and the East Annex Offices.
GLE has worked with the Miami-Dade Aviation Department (MDAD) since 1991, providing miscellaneous environmental engineering services.
GLE has provided asbestos and lead-based paint consulting for FAA facilities throughout Florida and Georgia.
The Florida Mental Health Institute (FMHI) is a two-story 210,000 square foot structure, occupied by over 350 employees.
GLE has served as the environmental consultant for approximately 300 projects of various scopes and magnitudes.
GLE served as the term environmental consultant for the School Board of Broward County.
GLE completed full design and permitting services for corrective measures to eliminate flooding within the existing recreation fields
GLE completed a Property Condition Assessment (PCA) Report for the Banking Client’s Tower located in downtown St.
GLE served as a construction services representative performing plan and cost reviews and inspections
GLE provided construction consulting and construction monitoring services associated with Florida Housing Finance Corporation’s (FHFC)
GLE has supervised the asbestos abatement/consulting at the Turkey Point Nuclear Plant since 1991.
GLE has served as JEA’s Industrial Hygiene and Safety consultant since 2006. Through this term contract...
GLE completed a pre-demolition asbestos survey at the FP&L Riviera Beach Power Plant. GLE inspected over 30 buildings in less than 15 days.
GLE was responsible for the design and permitting for the site improvements to support Duke Energy’s new 13,000 square foot Operations Building
Universal Supplies & Services, Inc. contracted GLE to perform an industrial hygiene assessment for the east range of an indoor firing range.
The Florida Army National Guard contacted GLE to perform turn-key bullet trap cleanup for 20 armory sites located throughout Florida.
GLE provided design services for accessibility upgrades at MacDill Air Force Base.
GLE provided design services for the re-roofing of nine buildings at MacDill Air Force Base.
GLE provided design services for the renovation of 16 restrooms. The project included replacement of the sewer lines into the buildings.
GLE has served as the environmental consultant and remediation contractor for the Tampa Housing Authority (THA) under an IDIQ contract.
GLE completed the development of a community center housing several services, including a police sub-station...
GLE completed the design for the renovation of the Community Center. GLE’s design for the Community Center
GLE completed the design for the renovation of Tuttle Apartments. A feasibility study was initially completed by GLE
GLE provided design and construction administration services for the complete interior and exterior renovations...
GLE completed the design of this new 28 apartment home community for the Sarasota Housing Funding Corporation.
As part of an A/E Term Contract, GLE completed comprehensive modernization renovations for the McCown Towers
GLE served as the facilities consultant for more than 15 public housing authorities (PHAs) throughout Florida.
GLE provided professional consulting services associated with HUD’s Green Physical Needs Assessment
The project consists of the renovation of the existing choir ministry space within the Nave of the Church.
The project consists of the expansion of the existing church from 700 seats to over 900 seats.
This project consisted of the renovations of the existing Narthex and Nave, and converting an existing meeting room...
GLE completed demolition of The Haven’s existing structure within the campus and the full permitting and design for their new facility.
GLE serviced this contract involving hundreds of water and mold assessments of properties located throughout the Southeast.
After decades of flooding that periodically affected a commerce park, GLE was requested to assess the flooding and to remedial options.
GLE provided design and facilities management services for Verizon Wireless, one of the nation’s largest cellular service providers.
GLE provided design services for The Capstone Group’s SouthTown Center in Tampa, FL. This prime office/retail
This 35,000 square-foot New Tampa YMCA recreational center is located in the Tampa Palms area.
The St. Petersburg Times consolidated its two Hernando County offices under one roof with a new 30,000-square-foot
After purchasing a Catholic church in north Tampa, the Bob Sierra YMCA called upon GLE to complete an evaluation ...
GLE was awarded a five year Master Service Agreement for Environmental Services with the Georgia-Pacific Corporation
GLE performed indoor air quality and mold consulting services at the Sam M. Gibbons U.S. Federal Courthouse.
GLE performed a comprehensive indoor air quality and HVAC assessment for the historic court house building.
GLE has held an environmental term contract with Manatee County since 2000. Services include environmental engineering...
GLE performed an in-depth building envelope, IAQ, and water intrusion study for the 100,000+ sq. ft. Lake County Courthouse.
GLE was requested to perform an extensive evaluation of the facility asbestos-containing materials (ACM) and lead-based paint (LBP).
GLE has performed hundreds of limited and full site assessments, site monitoring, and cleanup of sites in the State of Florida
The Ca’D’Zan (“House of John”) is the former residence of John and Mable Ringling located at the current site of the Ringling Museum
Broward County contracted GLE to perform a comprehensive IAQ and Water Intrusion study for the 250,000 SF Broward County...
GLE completed design services for Logan Laboratory, a renovation and addition project with a total construction cost of $3,700,000.
Shortly after completion of this five-story courthouse building, problems developed involving the building envelope.
Museum of Science & Industry: GLE completed comprehensive building envelope improvements to both the east and west wings...
GLE has served as the asbestos consultant for various FDOT districts throughout the State of Florida.
GLE was awarded the task order to perform diver based Endangered Species Act (ESA) coral relocations for the U.S. Army Corps of Engineers (USACE), Jacksonville District (SAJ).
GLE provided construction consulting and construction monitoring services associated with Florida Housing Finance Corporation’s (FHFC)
Subscribe To The GLE Blog