GLE performed indoor air quality and mold consulting services at the Sam M. Gibbons U.S. Federal Courthouse.
GLE performed a comprehensive indoor air quality and HVAC assessment for the historic court house building.
GLE has held an environmental term contract with Manatee County since 2000. Services include environmental engineering...
GLE performed an in-depth building envelope, IAQ, and water intrusion study for the 100,000+ sq. ft. Lake County Courthouse.
GLE was requested to perform an extensive evaluation of the facility asbestos-containing materials (ACM) and lead-based paint (LBP).
GLE has performed hundreds of limited and full site assessments, site monitoring, and cleanup of sites in the State of Florida
The Ca’D’Zan (“House of John”) is the former residence of John and Mable Ringling located at the current site of the Ringling Museum
Broward County contracted GLE to perform a comprehensive IAQ and Water Intrusion study for the 250,000 SF Broward County...
GLE completed design services for Logan Laboratory, a renovation and addition project with a total construction cost of $3,700,000.
Shortly after completion of this five-story courthouse building, problems developed involving the building envelope.
Museum of Science & Industry: GLE completed comprehensive building envelope improvements to both the east and west wings...
Subscribe To The GLE Blog